ACP Group

Caguas, Puerto Rico
Telephone: (787) 744-8030 | E-Mail: info@acppr.com

Project Gallery


 

Relocation of the Candelero Arriba Water Distribution System Pump Station Humacao

 

Client’s Name: The Puerto Rico Aqueducts & Sewer Authority (PRASA)
Budget: $1,243,200.00
Substantial date: September 29, 2011 (Delivered)
Services: Inspection

 

Scope:
The system suppliyng the Candelero area with potable water originates at the Humacao
and the Rio Blanco filtration plants. These facilities supply water to Cerro Candelero,
Candelero and Cabrito sectors using a network of branch piping 4” and 2” in diameter,
served by two pumping systems and several storage tanks and presusure - lowering
tanks.


Improvements to the Candelero Arriba water Distribution System will be performed in two phases: Phase 1 encompasses replace the existing Candelero 1 pump station with a new pump station on a lot acquired by PRASA on highway PR—3 plus construction of an express discharge pipe from the pumping station to Candelero 2 (Felo López) tank. Phase 2 consists of replacing existing pumping system Candelero 2 (Felo López.) with one of adequate capacity, and a discharge pipe to tanks Cabrito 1 and Cabrito 2.

 

Click here to download PDF

 


 

Gallery

 
 

 

         
   
         
   
         
 

 
         

Home  |  About the Firm  |  Our Services  |  Project Gallery  |  Recent News  |  Request Information  |  Contact Us

 


 

For more information please contact us at: info@acppr.com

© Copyrights 2011 - ACP Group. All Rights are Reserved.
Designed by: Mediatek